Beachlands School had a brand new two storey block of classrooms and break out spaces that required a full educational furniture fit out. This was a big job and Principal Anthony Noble-Campbell knew that Educated Furniture was well placed to take on the project. Having worked with Account Manager Graham Lyons through his previous school, Anthony had confidence that he would get the high quality products and service he required.
Initial Consultation
Consultation and planning began in early 2022 when Graham met with Anthony, his Deputy Principals and the team leaders who would be working in the new block. During the initial consultation they identified what the school wanted achieve and agreed that an open, bright and fresh look was needed to complement the new building.
Design Process
Following the initial consultation, Graham arranged for EF's CAD Designer to produce some computer rendered 3D images of the spaces. This would allow Anthony and his team to better visualise how the spaces would look once fully furnished.
Graham then returned to the school to present the quote and discuss the 3D images in more depth. Specific details were also finalised, such as colours schemes for the hard furnishings and fabrics choices for the soft furnishings.
School Furniture Solutions
With guidance from Graham the Beachlands team agreed on a colour pallet that would bring their open, bright and fresh theme to life. This included:
- Tables and educational units in a combination of Melteca Juicy, Memphis Blue, Storm
- Tables with whiteboard tops
- Chairs and stools in charcoal
- Soft furnishings in a charcoal blue and
- Tote trays in grey
This was a large scale school furniture fit out and upon acceptance of the final quote included the supply of the following items:
- Tall Tables
- Titan Chairs
- Pepper Stools
- Study Carrels
- Ottomans with backs
- Curved Tables
- Round Tables
- Kneeler Tables
- Teachers Work Podiums
- Semi Circle Tables
- Cubby Holes
- Low Rider Chairs and
- Tote Trays
The Final Product
Once the final quote was accepted the EF team got to work manufacturing the Beachlands order so that it was ready for delivery and installation as soon as the new building was complete. Graham arrived at the school on delivery day to confirm everything had arrived as ordered and to assist with furniture installation and placement.
Anthony and his team were delighted with the look and feel of the new block and with the service EF provided from start to finish. This was an example of an excellent collaboration and a project that we're really proud to have been a part of.